Skip to content

Home Renovation in Seremban: Whole-House Carpentry

For a full renovation in Seremban, we build and fit all the carpentry in the house, from kitchen and wardrobes to TV wall and storage, timed around the hacking, plumbing, wiring and tiling trades. A typical landed house renovation takes 4 to 8 weeks depending on scope. Market guides put whole-house work at RM20 to RM150 psf (iProperty Malaysia, 2026) and mid-range jobs at RM120 to RM200 psf (PropertyGuru Malaysia, 2026); those are not our quote, and our price is fixed after a site visit.

Home Renovation in Seremban: Whole-House Carpentry

We are a two-person carpentry workshop in Galla Industrial Park, not a general contractor. The cabinets, wardrobes and panels for your whole house are priced as one job, cut in our workshop and installed by the two of us.

The wet trades stay with other people. If you already have a renovation contractor, we fit into their schedule. If you do not, we plan the carpentry layout first, because it decides where the water points, sockets and ceiling drops should go.

What we take on in a whole-house job

Wet and dry kitchen
Both kitchens planned together, with appliance gaps agreed with the plumber and tiler while the walls are still open.
Wardrobes and bedroom built-ins
Every bedroom measured in one visit, so heights, skirting and door swings are handled the same way throughout.
TV wall and living room cabinets
Feature wall, sideboard and display units, placed after the socket plan and ceiling heights are settled.
Storage around the house
Under the stairs, store room, laundry corner and shoe cabinet at the door. Easy to forget when a house is priced room by room.
Panelling and boxing
Feature walls, headboard panels and boxing around beams or pipes, set out against the plaster and tile levels.
Order of work and site checks
A written list of stages, plus a site visit wherever our measure depends on another trade finishing first.

Renovation cost in Malaysia by part of the house, 2026 market ranges

Part of the houseMarket rangeSource
Whole house, basic to high-endRM20 to RM150 per sq ftiProperty Malaysia, 2026
Whole house, mid-rangeRM120 to RM200 per sq ftPropertyGuru Malaysia, 2026
Kitchen, every trade includedRM10,000 to RM100,000PropertyGuru Malaysia, 2026
BathroomRM5,000 to RM50,000PropertyGuru Malaysia, 2026
Living room and bedrooms with built-insRM10,000 to RM70,000PropertyGuru Malaysia, 2026
Buffer for surprises10% to 20% of the budgetPropertyGuru Malaysia, 2026

How much does a full house renovation cost in Seremban?

Most whole-house renovations in Malaysia fall between RM20 and RM150 per sq ft, according to iProperty Malaysia (2026). PropertyGuru Malaysia (2026) puts a mid-range job at RM120 to RM200 per sq ft. Multiply by your built-up area for a rough budget, then keep 10 to 20% aside.

Those are market numbers for all trades together, not our quote. For the carpentry part, our published prices start at about RM 9,000 for a small 10-ft kitchen, RM 5,000 for a 6-ft floor-to-ceiling wardrobe and RM 1,300 for an 8-ft TV feature wall.

Wet work moves the total most. Moving a kitchen, redoing bathrooms or rewiring costs far more than adding cabinets to a tiled house.

In what order should the renovation trades work?

Hacking goes first, then wet works and waterproofing, then plumbing and wiring, then plaster, tiling and ceiling. The final carpentry measure comes after all of that, and paint touch-ups and handles come last.

Measuring before tiling is a false saving. Tiles and their adhesive change the floor and wall levels, so panels cut to the bare wall arrive too tall or too wide and end up closed with filler strips.

Plan the carpentry early anyway. The kitchen and wardrobe layout tells the electrician where sockets belong and tells the plumber where the sink and washing machine points should land.

Is renovating a new house in Sendayan or Seremban 2 different from an older terrace?

Yes. A newly handed over house in Sendayan or Seremban 2 usually needs mostly carpentry, lighting and perhaps a kitchen extension, so it tends to sit at the shorter end of the 4 to 8 weeks.

Before anything is built in, report cracks, hollow tiles and leaks to the developer. A fitted wardrobe makes a wall much harder to repair later.

An older terrace near Seremban town often needs hacking, rewiring, new pipes and waterproofing before any cabinet goes in, and its walls are seldom straight, so every run is measured on site.

Should I hire an interior designer or a renovation contractor?

Hire an interior designer if the layout and look are still undecided, and a renovation contractor if those choices are made and the job is mostly building work. If most of the job is cabinets and wardrobes, a carpentry workshop like ours can quote you directly.

If you searched for interior design in Seremban, note that we have no designer on staff. We plan the layout with you on site or follow drawings you already have, and agree door colours, handles and panel lines before anything is cut.

How a whole-house job runs

  1. 1

    Walk through the house

    Send photos or a floor plan, then we visit and mark what is carpentry, what belongs to other trades and what stays.

  2. 2

    Agree the order

    Each stage gets a date and the decisions that must be closed before it starts, such as wall removals and socket positions.

  3. 3

    Measure when the site is ready

    Nothing is cut until tiling, plaster and ceiling are done. Then we take the final measure and confirm the price.

  4. 4

    Build and fit room by room

    Panels are made in Galla and brought in one room at a time, with handles and adjustments done at the end.

Whole-house renovation questions

Do you do hacking, plumbing, wiring and tiling?
No. Those are separate trades that you appoint and pay directly. We will tell you which ones the house needs, in what order, and what each one must finish before we measure.
I already have a renovation contractor. Can you do only the carpentry?
Yes, that is a common setup. From the contractor we need the date wet works finish, the ceiling heights, the socket and pipe layout as built, and access on measuring day.
Can we stay in the house during the renovation?
You can, but the job then goes room by room and takes longer. Hacking and wet works are the dusty weeks; after tiling and ceilings the house is livable again.
Can the carpentry be done in stages to spread the cost?
Yes. Many owners start with the kitchen and bedroom wardrobes, then add the TV wall and storage later. Plan the wiring for the later pieces now, so the sockets are already where they need to be.
Which areas do you cover?
Seremban, Sendayan, Seremban 2, Nilai, Senawang, Port Dickson and the rest of Negeri Sembilan, plus Kuala Lumpur and Melaka. Our projects page shows finished houses in Ara Sendayan, Taman Tiara Sendayan and Saujana Tropika.

Send us your floor plan

A floor plan or photos of each room, which rooms are in scope and whether you have a contractor is enough to start. We will reply with the order of work and a rough carpentry budget.

WhatsApp us for a free quote